Morning Shift Report — Unit 1 & 2

Template: Morning Shift ReportPeriod: Last Shift · 06:00 – 18:00Author: Sarah Khan

Executive Summary

  • Shift operations remained largely nominal with 210 MW net dispatchable confirmed with BETM.
  • One NOx excursion on Unit 1 at 14:22 (0.121 vs setpoint 0.120).
  • Brief SO2 breach on Unit 2 at 16:04 (0.507 vs 0.500), cleared within 8 minutes.
  • Boiler work order WO-4492 ~60% complete; thermal insulation nearing finalization.
  • Fuel supply steady at 112% of baseline for the full shift.

Trips, Derates & Excursions

NOx breach — 0.121 > setpoint 0.120
SWD:11BGFRNUPR-AV · 14:22 · 12m
SO2 breach — 0.507 > setpoint 0.500
SWD:12BGFRNUPR-AV · 16:04 · 8m
Ammonia anomaly — t2 = 1180.0 (z=2.12)
17:00 · trending high
Stack opacity anomaly — 1.40 (z=-2.19)
16:00 · below expected

Equipment & Work Orders

StatusEquipmentNote
Opened1G Gravimetric FeederBelt drive motor running rough — bearing/fan suspect
OpenedT2 548 Nuva FeederLeak on top of the tee
Opened1F Fuel ChuteHole worn through below the spider air
OpenedT2 590 Fly Ash VentElbow leak near "B" drop-out hoppers
ResolvedT1 B1 NIDs MixerLocked-up condition cleared by A crew

NOx & SO2 Trend Drift

Unit 1 emissions vs setpoint · last 7 days
SWD:11BGFRNUPR-AV
Unit 1 NOxSWD:11BGFRNUPR-AV
Unit 2 SO₂SWD:12BGFRNUPR-AV
Setpoint 0.120

Handoff & Follow-ups

Cleared de-rate with BETM (Dino) — good for 210 NET MW
Dispatch · 10:08
McCreary informed BETM Seward ready to return to AGC — approved
Dispatch · 03:57
Shift Change — GL: Prato · CRL: Czar/McCreary · T1: Westover · T2: Heltzel
00:44
T1 690 valve closed — Boiler 1 offline @ 02:50
Dispatch · 06:55